The roots of the swiss project pool
Security planning. Doors engineering. Data management.
​
Security planning.
Holistic view and implementation to capture the complex requirements and links. Integration of the defined concepts and guidelines (fire protection, operating concepts). Constructing policies and standards reduces costs by 10% or more.
Doors engineering
3% of the building costs are attributed to the doors, but 30% of these alone are used for the planning. Standards such as door type templates reduce the costs massively. door engineering with the basic document "Doors list" (Excel or software) connects nearly all segments of security planning and is required for planning, design, execution and maintenance.
Data management
The basic document "Doors list" is also required for maintenance and administration of the systems. Easy maintenance of collected data rather than on-site resume. "This also saves costs and pays off for the user.
​